Prices for rendered services and work
Name of work |
Price |
Deadlines |
1. Producing of block modular boiler house (fuel-natural gas): |
||
0,5 MW | From 50.000 USD | 2 — 3 month |
1,0 MW | From 75.000 USD | |
5,0 MW | From 270.000 USD | |
2. Installation of block-modular boiler house (fuel — natural gas) | From 13.000 USD (the price of installation is always individual and depends from the capacity of the boiler house, from its hardware configuration and network length of heat, water, gas, electricity) |
2 — 3 month |
3. Installation of a stationary boiler house (fuel — natural gas, power — 300-600 kW and higher) |
From 72.000 USD (the price of installation is always individual and depends from the capacity of the boiler house, from its hardware configuration and network length of heat, water, gas, electricity) |
2 — 3 month |
4. Designing of a block modular boiler house (fuel-Natural gas) | From 16.000 USD (depending from the power of boiler house, from its hardware configuration and network length of heat, water, gas, electricity, packaging equipment) |
1 — 1,5 month |
5. Designing of stationary boiler house (fuel -Natural gas) | From 20.000 USD (depending from the power of boiler house, from its hardware configuration and network length of heat, water, gas, electricity, packaging equipment)) |
1 — 1,5 month |
6. Maintenance of boiler house and equipments |
From 500 USD per month (depending from the distance, schedule and scope of work performed. For boiler house with power 3 MW and higher, cost is calculated individually) |
The frequency of visits from 1 to 4 times per month |
Call us and our experts will tell you in detail about the proposed equipment and
Group Company «Teplodar»: + 7-8772-57-51-95. «Exergy» LTD + 7-8772-57-57-59.